Media Centre

View our Case Studies

Henley Case Study
Henley Case Study

Aiding what is thought to be the largest monitored frogs and toads population in the UK, 250 metres of ACO Technologies’ One-Way Fence ...

Download PDF
Rushden Lakes 1
Beavers, Biodiversity, and Sustainable Drainage at Rushden Lake

The Rushden Lakes project in Northamptonshire combines innovative urban infrastructure with landmark environmental rejuvenation.

Download PDFVIEW WEB PAGE
Guiding the way at Ashridge Farm

As the construction industry looks for ways to mitigate its impact
on biodiversity, one highways project led by Balfour Beatty ...

Download PDFVIEW WEB PAGE
Wildlife Climate Tunnel Castle Hill
ACO Wildlife Climate Tunnel provides perfect ecological solution at Castle Hill project in Ebsfleet Valley

ACO Climate Tunnels were specified in order to support the ethos of the new Garden city and protect the local wildlife

Download PDF
Perth and Kinross
ACO Wildlife Kerb prevents amphibians from falling down roadside gullies

A safe and sustainable solution to prevent amphibians being trapped in roadside gullies in Perth and Kinross

Download PDF
Top