Media Centre

View our Case Studies

Gloucester gateway
Sustainable services - Gloucester Gateway

An environmentally sensitive Motorway service area that maximises bio-diversity and reduces flood risk with ACO solutions

Download PDF
A fitting campus for the 21st Century

A new state of the art university campus near to Northampton town centre.

Download PDF
A453
ACO KerbDrain provide fast, efficient drainage along various points of the A453 newly widened carriageway.

With design and cost a major consideration for this project, ACO worked with both the engineer and contractor to ensure targets were met.

Download PDF
Layton District Blackpool
ACO KerbDrain & RoadDrain help alleviate sustainability threatened by traffic & safety barriers in Blackpool.

ACO KerbDrain and ACO RoadDrain create a 'shared space' demarking boundaries between pedestrian walkways and vehicle carriageways.

Download PDF
Buckshaw Village
ACO KerbDrain used to remove standing water from new access road to landmark housing development in Chorley

By selecting the shallow invert ACO KerbDrain 305 system, designers were able to minimise the depth of swale required at Buckshaw village.

Download PDF
Top