ACO

Media Centre

View our Case Studies

M25 Junction 10
Wildlife Preservation at M25 Junction 10

As part of the wider M25 Junction 10/A3 Wisley Interchange Improvements – a Nationally Significant Infrastructure Project (NSIP) – the ...

Download PDF
Why did the adder cross the road?

ACO Water Management supplied two specially designed snake tunnels in Greenham and Crookham Commons to reconnect two groups of adders that ...

Download PDF
Henley Case Study
Henley Case Study

Aiding what is thought to be the largest monitored frogs and toads population in the UK, 250 metres of ACO Technologies’ One-Way Fence ...

Download PDF
Fabian Way
Drainage Solution on A483

As part of the wider A483 Fabian Way dual carriageway improvements, ACO Technologies was tasked with alleviating a recurring road flooding ...

Download PDF
Silvertown Tunnel

Silvertown Tunnel – a new tunnel highway under the River Thames help eases congestion in London. Designated as a Nationally Significant ...

Download PDF
Toneway Junction: The Road to High Capacity

ACO provides an optimised drainage solution that still catered for the high-capacity requirements present within an urban highway environment.

Download PDFVIEW WEB PAGE
Top